Master Ali

Wall finishing and leak repair Dealers wanted nationwide

You are here: Home » Wall paint » All-Purpose Alkali-Resistant Sealing Primer 18L

  • All-Purpose Alkali-Resistant Sealing Primer 18L

All-Purpose Alkali-Resistant Sealing Primer 18L

Ali Master All-Purpose Alkali-Resistant Interior and Exterior Wall Sealing Primer adopts new-generation synthetic technology and is specially designed as an intermediate latex paint applied between the substrate base and the topcoat.

Franchise hotline 400-830-9488

Inquire Now

Product Introduction |  PRODUCT PRESENTATION



of application< td style="">

12-15 square meters/liter/single coat

product model

all-in-one alkali-resistant sealing primer

specification

18L/20KG 

Scope

interior wall

gloss

matte

Coating area
Application Scope

used for interior wall decoration and protection



 Product Features | PRODUCT FEATURES


● 1. Strong alkali resistance

● 2. Resistance to pan-salting

● 3. Good sealing properties and fast drying

● 4. Enhances wall system durability

● 5. Resists whitening and bleaching



scene display |  SCENE DISPLAY




product description  |  PRODUCT DESCRIPTION




Construction Guide | CONSTRUCTION GUIDE


coats) < td style=""> 14-16 square meters/kg/coat. Due to differences in the actual roughness of the surface and the dilution ratio, paint consumption also varies.
Construction Method roller coating, brushing, or airless spraying
Substrate treatment
Wall treatment — new wall construction - surface dust removal - greasy and loose mud plaster. If there are any pores, repair them promptly to ensure the wall surface is clean, dry, and smooth. — Recoating the wall surface – remove unstable paint films from old walls, clear out surface dust and debris, level and sand, and clean thoroughly to dry. Surface dry condition — ensure the surface moisture of the precoat substrate is less than 10%, pH below 10% — the surface of the precoat substrate is firm, dry, clean, flat, and free of loose or detached material.
recoat time Coating System Primer 1-2 coats, Topcoat 2 coats (recommended number of coat
Paint
Consumption
Construction Humidity Please avoid construction in humid or cold weather (temperature below 5°C, relative humidity above 85%), otherwise the desired coating effect will not be achieved.
Maintenance Time
7 days/25°C; Low temperature (not below 5°C) should be appropriately extended to achieve the desired paint film effect.
Tool Cleaning After pausing during painting and finishing the painting, promptly rinse all instruments with clean water



LinksAuto Spray EquipmentSpray GunPaint FranchiseWood Paint MakerChina Coatings NetGarment TagsArt Paint FranchiseArt PaintCustom office furnitureOffice furniture manufacturerImported Decorative PaintOffice furnitureImported Decorative PaintOffice furniture brandOffice furniture designSearch External Links

© 2017 Master Ali All rights reserved. ICP: Yue ICP Bei No. 11031542